Downtown Disney Causeway - Lake Buena Vista, FL
Type of Project:
Stormwater Retention
Purpose of Piling:
Permanent Cofferdam
Equipment Used:
ECO1400 S Silent Piler
The Silent Piler was used to install the steel sheet pile cofferdam / causeway to minimize the impact to the operating themed attraction as well as the very tight tolerances required. The entire causeway was designed based on a radius the entire length. The permanent structure required precise installation to allow for the precast concrete panels to be installed after installation. The steel sheet piles are carrying the entire bridge load from walkways above.